• NUMPTY37K@lemmy.world
    link
    fedilink
    English
    arrow-up
    4
    ·
    1 year ago

    Long lead times against nuclear have bee raised for the last 25 years, if we had just got on with it we would have the capacity by now. Just cause the lead time is in years doesn’t mean it isn’t worth doing.

    • abraxas@lemmy.ml
      link
      fedilink
      English
      arrow-up
      2
      ·
      1 year ago

      As others pointed out, to build that many nuclear power plants that quickly would require 10x-ing the world’s construction capacity.

      My counterpoint is that if we had “just got on with it” for solar, wind, and battery, we would have the capacity by now and the cost per kwh of that capacity would be approximately half as much as the same in nuclear. And we would have amortized the costs.

    • Quacksalber@sh.itjust.works
      link
      fedilink
      English
      arrow-up
      3
      ·
      1 year ago

      Long lead times, cost overruns, producing power at a higher price point than renewables, long run time needed to break even, even longer dismantling times and a still unsolved waste problem. Compared to renewables that we can build right now.

    • Resonosity@lemmy.ca
      link
      fedilink
      English
      arrow-up
      0
      ·
      1 year ago

      Did you read the quote? 15-20 years, as in decades before 1 nuke plant is built. I agree in that politicians of the past should have led us to a more sustainable and resilient energy future, but we’re here now.

      Advanced nuclear should still be 100% pursued to try to get those lead times down and to incorporate things like waste recycling, modularity, etc., but the lead time in decades absolutely means nuclear power might not be something worth doing.

      The IPCC puts the next 10-20 years as the most important and perilous for getting a hold on climate change. If we wait for that long by not rolling out emission-free power sources, transit modes, or even carbon-free concrete, etc., then we might cross planetary boundaries that we can’t come back from.

      Nuclear is a safe bet and bet worth pursuing. I would argue that, along with that source from the IAEA, old nuclear is note worth it.

      • Corkyskog@sh.itjust.works
        link
        fedilink
        English
        arrow-up
        0
        arrow-down
        1
        ·
        1 year ago

        How much concrete does it take to build a nuclear plant? Concrete production is currently 8% of global emissions, so if you have to scale up construction capacity 10x for the next decade, don’t you end up destroying the environment with concrete before they are even operational?

        • Resonosity@lemmy.ca
          link
          fedilink
          English
          arrow-up
          0
          ·
          1 year ago

          Great point. You need concrete for wind, solar, and li-ion battery storage too (including pumped hydro), but out of those I’d say pumped hydro is the only one that remotely compares in the amount of concrete needed for construction.

          So purely looking at the emissions from materials needed to build these power sources, renewables have the edge due to less concrete. These emissions might show up elsewhere in raw material extraction like with silicon for solar, and then the rare earth metals needed for generators in wind, all the lithium/nickel/cobalt needed for batteries, etc., but I want to say that the Life Cycle Assessments (LCAs) from places like the National Renewable Energy Laboratory (NREL) in the US or the International Energy Agency (IEA) worldwide have taken that into account and still show that renewables + storage are cheaper on a carbon basis compared to fossil fuels and nuclear.

          • Corkyskog@sh.itjust.works
            link
            fedilink
            English
            arrow-up
            1
            ·
            1 year ago

            The cool thing about concrete for renewables (excluding hydro dam) is only the very base pad needs to be virgin. You can make a lot of the rest of the base and fill material with down cycled concrete. So tearing down part of an old factory on land near the solar panels are? Crush it up and only move it a few miles over to where you need it. Rather than hauling that to a landfill where it sits forever, costing energy use to haul, and more energy use to bring the fill and other bade materials from a further destination.